CUSTOMER
|
DISCRIPTION |
WORK PERIOD
|
| E TEC E&C / KOREA COTTRELL |
ELECTRICAL WORK FOR GUNJANG ENERGY MAIN BOILER ELECTROSTATIC PRECIPITATOR |
APR.07-JUL.07 |
| DAC |
ELECTRICAL WORK FOR DAC OEM CAR PAINT POWER RECEPTION SYSTEM |
APR.07-JUL.07 |
| KCC |
ELECTRICAL WORK FOR G/W #3 PRODUCTION INCREASE |
APR.07-MAY.07 |
| KCC |
ELECTRICAL WORK FOR CENTRAL RESEARCH INSTITUTE MAIN BUILDING POWER RECEPTION AND TRANSFORMATION SYSTEM |
MAR.07-MAY.07 |
| TONG YANG MAJOR |
ELECTRICAL WORK FOR KWANG YANG SILO PRODUCTION INCREASE(EXTRA HIGH VOLTAVE EQUIPMENT, SILO) |
FEB.07-AUG.07 |
| ASIA CEMENT |
POWER AND CONTROL WORK FOR DAEGU FACTORY B/P PRODUCTION INCREASE |
FEB.07-MAR.07 |
| HANIL CEMENT |
INCHEON FACTORY #2 DRYER SAND SEPARATOR(ELECTRICAL POWER) |
JAN.07-MAY.07 |
| ASIA CEMENT |
ELECTRICAL WORK FOR DAEGU BATCHER PLANT RECEPTION AND TRANSFORMATION SYSTEM |
JAN.07-FEB.07 |
| SSANGYONG CEMENT INDUSTRY |
YOUNGWOL FACTORY SUB MATERIAL STORAGE FACILITY(FIRE FIGHTING) |
DEC.06-FEB.07 |
| KCC |
HIV ELECTRICAL WORK AND INSTRUMENTATION |
SEP.06-AUG.07 |
| KOREA SOUTH EAST POWER / KOREA COTTRELL |
YONGHUNG THERMAL 1MW SOLAR POWER PROJECT(ELECTRICAL WORK) |
AUG.06-DEC.06 |
| KCC |
COMPRESSOR MOTOR CAPACITY INCREASE ETC(ELCTRICAL WORK) |
AUG.06-DEC.06 |
| HANIL CEMENT |
INCHEON FACTORY #2 MIXER AND PACKAGING FACILITY REVAMPING |
JUN.06-MAR.07 |
| HANIL CEMENT |
MOKPO FACTORY 10KG WH METER INSTALLATION |
MAY.06-JUN.06 |
| ASIA CEMENT |
ELECTRICAL AUXILIARY WORK FOR DAEGU FACTORY DRY MORTAR CONSTRUCTION |
MAY.06-JUN.06 |
| ASIA CEMENT |
DAEGU FACTORY DRY MORTAR MAINLINE AND POWER WORK |
FEB.06-APR.06 |
| ASIA CEMENT |
CONTROL WORK FOR DAEGU FACTORY MORTAR CONSTRCUTION |
FEB.06-APR.06 |
| KOREA COTTRELL |
POHANG 3 SINTERING PLANT REVAMPING, INTERNAL REPLACEMENT OF DUST COLLECTOR ITEMS |
FEB.06-APR.06 |
| ASIA CEMENT |
DAEGU FACTORY POWER RECEPTION AND TRANSFORMATION SYSTEM |
NOV.05-FEB.06 |
| HANIL CEMENT |
KAYA READY MIXED MORTAR PLANT EXTENSION(POWER SECTION) |
DEC.05-APR.06 |
| HANIL CEMENT |
MOKPO READY MIXED MORTAR PLANT SYSTEM(ELECTRICAL POWER) |
NOV.05-APR.06 |
| HANIL CEMENT |
MOKPO READY MIXED MORTAR PLANT SYSTEM(POWER RECEPTION) |
OCT.05-APR.06 |
| ASIA CEMENT |
JECHEON FACTORY PACKAGING ROOM AUTOMATION SYSTEM SHIFT & ELECTRICAL WORK FOR CONTROL ROOM INTEGRATION |
AUG.05-SEP.05 |
| HANIL CEMENT |
HAMAN FACTORY PACKAGING SYSTEM(POWER SECTION) |
JUN.05-AUG.05 |
| ASIA CEMENT |
ELECTRICAL WORK FOR AGGREGATE PLANT CONSTRUCTION |
MAY.05-JUL.05 |
| HANIL CEMENT |
JOCHIWON SPECIAL READY MIXED MORTAR PLANT PRODUCT SILO POWER |
MAR.05-MAY.05 |
| ASIA CEMENT |
YONGIN FACTORY SILO EXTENSION ELECTIRCAL WORK |
MAR.05-MAR.05 |
| KOREA COTTRELL |
ELECTRICAL WORK AND INSTRUMENTATION FOR DANYANG FACTORY K2 EP EXTENSION |
FEB.05-APR.05 |
| HANIL CEMENT |
INCHEON FACTORY #1.3 MIXER REVAMPING POWER WORK |
JAN.05-APR.05 |
| KOREA COTTRELL |
ELECTRICAL WORK AND INSTUMENTATION FOR TONGYANG C SAMCHUCK FACTORY KILN COOLER EP ROOM 1 |
DEC.04-MAR.05 |
| ASIA CEMENT |
ELECTRICAL WORK FOR YONGIN FACTORY RESEARCH BUILDING |
DEC.04-JAN.05 |
| HANIL CEMENT |
JOCHIWON SPECIAL READY MIXED MORTAR PLANT |
NOV.04-APR.05 |
| ASIA CEMENT |
SUWON FACTORY PACKER REMOVAL AND FACILITY MANAGEMENT STREAMLINING |
DEC.04-JAN.05 |
| HANIL CEMENT |
JOCHIWON FACTORY POWER RECEPTION |
SEP.04-NOV.04 |
| HANIL CEMENT |
INCHEON FACTORY #1 DRYER REVAMPING(POWER SECTION) |
FEB.04-MAR.04 |
| ASIA CEMENT |
YONGIN FACTORY DRY MORTAR CONSTRUCTION(CONTROL WORK) |
FEB.04-MAY.04 |
| ASIA CEMENT |
YONGIN FACTORY DRY MORTAR CONSTRUCTION(POWER WORK) |
JAN.04-MAR.04 |
| SAMWOO |
SSANGYONG CEMENT INDUSTRY EAST SEA FACTORY #5.6 KILN BAG FILTER INSTALLATION |
DEC.03-APR.04 |
| ASIA CEMENT |
ELECTRICAL WORK FOR YONGIN FACTORY B/P CONSTRUCTION |
APR.03-MAY.03 |
| KCC |
ELECTRICAL WORK FOR MOONMAK FACTORY G/W #3 EQUIPMENT |
APR.03-AUG.03 |
| DAEWOO ENGINEERING |
TONG YANG CEMENT SAMCHUK FACTORY HEAT RECOVERY PLANT CONSTRUCTION |
APR.03-JUL.04 |
| POSCON |
ELECTRICAL WORK FOR INCHEON LOCK GATE |
APR.03-SEP.04 |
| KOREA COTTRELL |
ELECTRICAL WORK AND INSTRUMENTATION FOR SSANGYANG CEMENT INDUSTRY #5 KILN E-BF |
APR.03-JUL.04 |
| ASIA CEMENT |
ELECTRICAL WORK FOR INSTALLATION OF YONGIN READY MIXED CONCRETE POWER RECEPTION AND TRANSFORMATION |
JAN.03-JAN.03 |
| ASIA CEMENT |
ELECTRICAL WORK FOR SUWON FACTORY POWER RECEPTION AND TRANSFORMATION |
JAN.03-JAN.03 |
| HANIL CEMENT |
SUNGNAM FACTORY POWER RECEPTION SYSTEM REVAMPING AND CAPACITY INCREASE WORK |
NOV.02-JAN.03 |
| KOREA COTTRELL |
ELECTRICAL WORK AND INSTRUMENTATION FOR SUNGSHIN CEMENT #5 KILN BAG HOUSE |
NOV.02-MAR.03 |
| SSANGYONG CEMENT INDUSTRY |
SYSTEM WORK FOR YOUNGWOL FACTORY #3.7 CRANE CONTROL SHIFT |
DEC.02-DEC.04 |
| DUON SYSTEM |
YONGHUNG THERMAL PLANT 1, 2 MAIN CONTROL SYSTEM INSTALLATION |
OCT.02-JUL.03 |
| ASIA CEMENT |
JECHEON FACTORY REVAMPING ELECTRICAL WORK |
JAN.02-DEC.02 |
| DAEKYUNG MACHINERY AND ENGINEERING |
ELECTRICAL WORK AND INSTRUMENTATION FOR YONGHUNG THERMAL PLANT AUXILIARY BOILER INSTALLATION |
DEC.01-JAN.03 |
| ASIA CEMENT |
ELECTRICAL WORK FOR COAL UNLOADING FACILITY AND TRANSPORTATION B/C LINE INSTALLATION |
NOV.01-JAN.02 |
| ASIA CEMENT |
C-1,2 AUTOMATION ELECTRICAL WORK |
OCT.01-JAN.02 |
| ASIA CEMENT |
MAIN POWER WORK FOR COAL EQUIPMENT INSTALLATION AND UNLOADING FACILITY AND GROUND CONNECTION |
SEP.01-DEC.01 |
| BIOMECCA |
ELECTRICAL WORK FOR YEOSU, GYEONGSAN, IKSAN WASTEWATER TREATMENT DEORDORIZATION SYSTEM |
AUG.01-NOV.11 |
| ASIA CEMENT |
ELECTRICAL WORK FOR LIMESTONE B/CONV' AUTOMATION AND CONTROL ROOM INTERGRATION |
MAY.01-AUG.01 |
| ASIA CEMENT |
ELECTRICAL WORK FOR K-3,4 WASTE PLASTIC CRUSHER INSTALLATION |
MAY.01-JUL.01 |
| SAMSUNG CORPORATION |
ELECTRICAL WORK AND INSTRUMENTATION FOR KIHUNG NITROGEN PLANT CONSTRUCTION |
OCT.00-MAY.01 |
| DONGBU CORPORATION |
ELECTRICAL WORK FOR MILITARY FACILITY CONSTRUCTION IN 00 AREA |
JUL.00-MAR.02 |
| SEOUL METROPOLITAN POLICE AGENCY |
TRAFFIC MONITORING DEVICE AND CABINET REPAIR |
JUL.00-NOV.00 |
| POSCON |
PLUG IN WORK(11A BHS SORTER POWER ELECTROCITY) |
JAN.01-MAR.03 |
| POSCON |
BHS SORTER SYSTEM ELECTRICAL WORK 1 |
OCT.99-DEC.99 |
| POSCON |
ELECTRICAL WORK FOR PRE COMM'(NEW AIRPORT BAGGAGE SYSTEM) |
AUG.99-MAR.03 |
| SAMSUNG HEAVY INDUSTRIES |
INCHEON HOUSEHOLD WASTE INCINERATOR FACILITY CONSTRUCTION |
JUN.96-DEC.01 |
| ASIA CEMENT |
ELECTRICAL WORK FOR RAM MILL-1,2 AUTOMATION |
DEC.98-MAR.99 |
| ASIA CEMENT |
ELECTRICAL WORK FOR K-3 COOLER ALTERATION |
NOV.98-APR.99 |
| ASIA CEMENT |
ELECTRICAL WORK FOR DEOKSO LOADING FACILITY EXTENSION |
SEP.97-NOV.97 |
| SANGMYUNG UNIVERSITY |
CHEONAN CAMPUS MULTI PURPOSE HALL POWER TRANSFORMATION SYSTEM INSTALLATION |
APR.97-JUL.97 |
| HANIL ENGINEERING AND CONSTRUCTION |
#9 C/M MANUFACTURING / INSTALLATION |
MAR.97-AUG.97 |
| ASIA PAPER |
INSTRUMENTATION FOR PM3 AUTOMATION |
JAN.97-MAY.97 |
| ASIA PAPER |
PM3 154KV S/S ADDITIONAL WORK |
MAY.96-APR.97 |
| TONG YANG CEMENT |
KUNSAN SPECIAL D-M ELECTRICAL WORK |
MAY.96-NOV.96 |
| TONG YANG CEMENT |
INSTRUMENTATION FOR COAL PULVERIZATION ROOM 5 |
MAY.96-JUL.96 |
| TONG YANG CEMENT |
DAEBUL S/S ELECTRICAL WORK |
MAR.96-NOV.96 |
| TONG YANG CEMENT |
BUSAN JEONGKWAN B/P ELECTRICAL WORK |
MAR.96-JUN.96 |
| TONG YANG CEMENT |
BUSAN FACTORY 1 B/P CAPACITY INCREASE ELECTRICAL WORK |
FEB.96-APR.96 |
| ASIA CEMENT |
ELECTRICAL WORK FOR DRY MORTAR EQUIPMENT |
JAN.96-APR.96 |
| HANIL CEMENT |
SILO ELECTRICAL WORK |
SEP.95-MAY.96 |
| HANIL CEMENT |
K-1,2 AQC ELECTRICAL ROOM RESTORATION |
OCT.95-OCT.95 |
| HANIL CEMENT |
ELECTRICAL WORK FOR 6.6 KV MAIN CABLE DISTRIBUTION |
SEP.95-JUN.96 |
| HANIL CEMENT |
CLINKER TRANSFER EQUIPMENT ELECTRICAL WORK AND INSTRUMENTATION |
SEP.95-MAY.96 |
| HANIL CEMENT |
RM&EP ELECTRICAL WORK AND INSTRUMENTATION |
SEP.95-MAY.96 |
| HANIL CEMENT |
KILN ELECTRICAL WORK AND INSTRUMENTATION |
SEP.95-MAY.96 |
| DONG KUNG CONCRETE |
DRY MORTAR POWER CABLE EXTENSION |
SEP.95-SEP.95 |
| TONG YANG CEMENT |
ELECTRICAL WORK FOR ANYANG FACTORY POWER RECEPTION AND CABLE TRAY REINSTALLATION |
AUG.95-AUG.98 |
| ASIA CEMENT |
LIMESTONE CMB CONSTRUCTION ELECTRICAL WORK |
MAY.95-NOV.95 |
| ASIA CEMENT |
1, 2 MINE CRUSHER INSTALLATION ELECTRICAL WORK |
APR.95-DEC.95 |
| ASIA CEMENT |
MINE DISTRIBUTION CABLE TRAY INSTALLATION |
APR.95-NOV.95 |
| ASIA CEMENT |
ELECTRICAL WORK FOR YONGIN FACTORY RESEARCH BUILDING |
DEC.04-JAN.05 |
| HANIL CEMENT |
#5 C/M POLYCOM FACILITY(ELECTRICAL) |
MAY.95-JUN.95 |
| TONG YANG CEMENT |
KWANGYANG SLAG PLANT MILL PART ELECTRICAL WORK |
MAR.95-JUN.95 |
| HANIL CEMENT |
KAYA READY MIXED MORTAR FACTORY POWER RECEPTION SYSTEM WORK |
JAN.95-MAY.95 |
| HANIL CEMENT |
POHANG PLANT EXTENSION(ELECTRICAL WORK) |
JAN.95-JUL.95 |
| TONG YANG CEMENT |
K-3 E.P CONSTRUCTION ELECTRICAL WORK |
DEC.94-FEB.95 |
| TONG YANG CEMENT |
ELECTRICAL WORK FOR DONG JIN GONGYOUNG B/P AND WASTE WATER TREATMENT FACILITY |
OCT.94-DEC.94 |
| TONG YANG CEMENT |
6K RESTORATION MATERIALS SUPPLY AND PREHEATING SECTOR |
AUG.94-NOV.94 |
| TONG YANG CEMENT |
JEONJU FACTORY SILO EXTENTION(ELECTRICAL) |
JUL.04-NOV.94 |
| TONG YANG CEMENT |
DOAN S.S CONSTRUCTION ELECTRICAL WORK |
JUN.94-SEP.94 |
| DAEWOO ENGINEERING |
TONG YANG CONFECTIONERY CHEONGJU FACTORY SNACK BUILDING ELECTRICAL WORK |
MAR.94-JUN.94 |
| ORION FRITO-LAY |
DORITOS/FRITOS LINE ELECTRICAL WORK |
APR.94-MAY.94 |
| ASIA CEMENT |
K-1,2 BLENDING SILO ELECTRICAL WORK |
APR.94-AUG.94 |
| TONG YANG CEMENT |
OSIP STREAM HWENGDAN 4 B/D LINE ELECTRICAL WORK |
FEB.94-FEB.94 |
| TONG YANG CEMENT |
NEW CEMENT MILL PULVERIZATION ROOM SECTION POWER |
JAN.94-JUN.94 |
| TONG YANG CEMENT |
DAEWON SANUP B/P SHIFT ELECTRICAL WORK |
JAN.94-DEC.94 |