Electrical Business Division
  - Construction
     Electrical
Team
  - Plant Team
    Major Experience Work
  - Construction
     Electrical Business
  - Plant & Automation
 
 
    Business Introduce > Major work
(FIELD OF PLANT & AUTOMATION)  
 

CUSTOMER

DISCRIPTION

WORK PERIOD

SAMSUNG

STCS MODERNIZATION PJT ELECTRICAL WORK

OCT.14-JUL.15

KCC

BATCH PLANT ELECTRICAL WORK

MAY.14-JAN.15

SAMSUNG

TANG-JUNG CONTROL DUCT ELECTRICAL WORK

FEB.14-JUL.14

JOONG ONE

GONG-JU COMPANY ELECTRICAL WORK

FEB.13-FEB.14

POSCO

AN-SAN THERMAL POWER GENERATION ELECTRICAL WORK

JAN.13-SEP.13

KYUNG DONG

KIM-PO SUNLIGHT GENERATION ELECTRICAL WORK

OCT.09-DEC.09

DOOSAN CO.

BORYUNG THERMAL POWER GENERATION ELECTRICAL WORK

OCT.08-ARP.09

E TEC E&C / KOREA COTTRELL ELECTRICAL WORK FOR GUNJANG ENERGY MAIN BOILER ELECTROSTATIC PRECIPITATOR
APR.07-JUL.07
DAC ELECTRICAL WORK FOR DAC OEM CAR PAINT POWER RECEPTION SYSTEM
APR.07-JUL.07
KCC ELECTRICAL WORK FOR G/W #3 PRODUCTION INCREASE
APR.07-MAY.07
KCC ELECTRICAL WORK FOR CENTRAL RESEARCH INSTITUTE MAIN BUILDING POWER RECEPTION AND TRANSFORMATION SYSTEM
MAR.07-MAY.07
TONG YANG MAJOR ELECTRICAL WORK FOR KWANG YANG SILO PRODUCTION INCREASE(EXTRA HIGH VOLTAVE EQUIPMENT, SILO)
FEB.07-AUG.07
ASIA CEMENT POWER AND CONTROL WORK FOR DAEGU FACTORY B/P PRODUCTION INCREASE
FEB.07-MAR.07
HANIL CEMENT INCHEON FACTORY #2 DRYER SAND SEPARATOR(ELECTRICAL POWER)
JAN.07-MAY.07
ASIA CEMENT ELECTRICAL WORK FOR DAEGU BATCHER PLANT RECEPTION AND TRANSFORMATION SYSTEM
JAN.07-FEB.07
SSANGYONG CEMENT INDUSTRY YOUNGWOL FACTORY SUB MATERIAL STORAGE FACILITY(FIRE FIGHTING)
DEC.06-FEB.07
KCC HIV ELECTRICAL WORK AND INSTRUMENTATION
SEP.06-AUG.07
KOREA SOUTH EAST POWER / KOREA COTTRELL YONGHUNG THERMAL 1MW SOLAR POWER PROJECT(ELECTRICAL WORK)
AUG.06-DEC.06
KCC COMPRESSOR MOTOR CAPACITY INCREASE ETC(ELCTRICAL WORK)
AUG.06-DEC.06
HANIL CEMENT INCHEON FACTORY #2 MIXER AND PACKAGING FACILITY REVAMPING
JUN.06-MAR.07
HANIL CEMENT MOKPO FACTORY 10KG WH METER INSTALLATION
MAY.06-JUN.06
ASIA CEMENT ELECTRICAL AUXILIARY WORK FOR DAEGU FACTORY DRY MORTAR CONSTRUCTION
MAY.06-JUN.06
ASIA CEMENT DAEGU FACTORY DRY MORTAR MAINLINE AND POWER WORK
FEB.06-APR.06
ASIA CEMENT CONTROL WORK FOR DAEGU FACTORY MORTAR CONSTRCUTION
FEB.06-APR.06
KOREA COTTRELL POHANG 3 SINTERING PLANT REVAMPING, INTERNAL REPLACEMENT OF DUST COLLECTOR ITEMS
FEB.06-APR.06
ASIA CEMENT DAEGU FACTORY POWER RECEPTION AND TRANSFORMATION SYSTEM
NOV.05-FEB.06
HANIL CEMENT KAYA READY MIXED MORTAR PLANT EXTENSION(POWER SECTION)
DEC.05-APR.06
HANIL CEMENT MOKPO READY MIXED MORTAR PLANT SYSTEM(ELECTRICAL POWER)
NOV.05-APR.06
HANIL CEMENT MOKPO READY MIXED MORTAR PLANT SYSTEM(POWER RECEPTION)
OCT.05-APR.06
ASIA CEMENT JECHEON FACTORY PACKAGING ROOM AUTOMATION SYSTEM SHIFT & ELECTRICAL WORK FOR CONTROL ROOM INTEGRATION
AUG.05-SEP.05
HANIL CEMENT HAMAN FACTORY PACKAGING SYSTEM(POWER SECTION)
JUN.05-AUG.05
ASIA CEMENT ELECTRICAL WORK FOR AGGREGATE PLANT CONSTRUCTION
MAY.05-JUL.05
HANIL CEMENT JOCHIWON SPECIAL READY MIXED MORTAR PLANT PRODUCT SILO POWER
MAR.05-MAY.05
ASIA CEMENT YONGIN FACTORY SILO EXTENSION ELECTIRCAL WORK
MAR.05-MAR.05
KOREA COTTRELL ELECTRICAL WORK AND INSTRUMENTATION FOR DANYANG FACTORY K2 EP EXTENSION
FEB.05-APR.05
HANIL CEMENT INCHEON FACTORY #1.3 MIXER REVAMPING POWER WORK
JAN.05-APR.05
KOREA COTTRELL ELECTRICAL WORK AND INSTUMENTATION FOR TONGYANG C SAMCHUCK FACTORY KILN COOLER EP ROOM 1
DEC.04-MAR.05
ASIA CEMENT ELECTRICAL WORK FOR YONGIN FACTORY RESEARCH BUILDING
DEC.04-JAN.05
HANIL CEMENT JOCHIWON SPECIAL READY MIXED MORTAR PLANT
NOV.04-APR.05
ASIA CEMENT SUWON FACTORY PACKER REMOVAL AND FACILITY MANAGEMENT STREAMLINING
DEC.04-JAN.05
HANIL CEMENT JOCHIWON FACTORY POWER RECEPTION
SEP.04-NOV.04
HANIL CEMENT INCHEON FACTORY #1 DRYER REVAMPING(POWER SECTION)
FEB.04-MAR.04
ASIA CEMENT YONGIN FACTORY DRY MORTAR CONSTRUCTION(CONTROL WORK)
FEB.04-MAY.04
ASIA CEMENT YONGIN FACTORY DRY MORTAR CONSTRUCTION(POWER WORK)
JAN.04-MAR.04
SAMWOO SSANGYONG CEMENT INDUSTRY EAST SEA FACTORY #5.6 KILN BAG FILTER INSTALLATION
DEC.03-APR.04
ASIA CEMENT ELECTRICAL WORK FOR YONGIN FACTORY B/P CONSTRUCTION
APR.03-MAY.03
KCC ELECTRICAL WORK FOR MOONMAK FACTORY G/W #3 EQUIPMENT
APR.03-AUG.03
DAEWOO ENGINEERING TONG YANG CEMENT SAMCHUK FACTORY HEAT RECOVERY PLANT CONSTRUCTION
APR.03-JUL.04
POSCON ELECTRICAL WORK FOR INCHEON LOCK GATE
APR.03-SEP.04
KOREA COTTRELL ELECTRICAL WORK AND INSTRUMENTATION FOR SSANGYANG CEMENT INDUSTRY #5 KILN E-BF
APR.03-JUL.04
ASIA CEMENT ELECTRICAL WORK FOR INSTALLATION OF YONGIN READY MIXED CONCRETE POWER RECEPTION AND TRANSFORMATION
JAN.03-JAN.03
ASIA CEMENT ELECTRICAL WORK FOR SUWON FACTORY POWER RECEPTION AND TRANSFORMATION
JAN.03-JAN.03
HANIL CEMENT SUNGNAM FACTORY POWER RECEPTION SYSTEM REVAMPING AND CAPACITY INCREASE WORK
NOV.02-JAN.03
KOREA COTTRELL ELECTRICAL WORK AND INSTRUMENTATION FOR SUNGSHIN CEMENT #5 KILN BAG HOUSE
NOV.02-MAR.03
SSANGYONG CEMENT INDUSTRY SYSTEM WORK FOR YOUNGWOL FACTORY #3.7 CRANE CONTROL SHIFT
DEC.02-DEC.04
DUON SYSTEM YONGHUNG THERMAL PLANT 1, 2 MAIN CONTROL SYSTEM INSTALLATION
OCT.02-JUL.03
ASIA CEMENT JECHEON FACTORY REVAMPING ELECTRICAL WORK
JAN.02-DEC.02
DAEKYUNG MACHINERY AND ENGINEERING ELECTRICAL WORK AND INSTRUMENTATION FOR YONGHUNG THERMAL PLANT AUXILIARY BOILER INSTALLATION
DEC.01-JAN.03
ASIA CEMENT ELECTRICAL WORK FOR COAL UNLOADING FACILITY AND TRANSPORTATION B/C LINE INSTALLATION
NOV.01-JAN.02
ASIA CEMENT C-1,2 AUTOMATION ELECTRICAL WORK
OCT.01-JAN.02
ASIA CEMENT MAIN POWER WORK FOR COAL EQUIPMENT INSTALLATION AND UNLOADING FACILITY AND GROUND CONNECTION
SEP.01-DEC.01
BIOMECCA ELECTRICAL WORK FOR YEOSU, GYEONGSAN, IKSAN WASTEWATER TREATMENT DEORDORIZATION SYSTEM
AUG.01-NOV.11
ASIA CEMENT ELECTRICAL WORK FOR LIMESTONE B/CONV' AUTOMATION AND CONTROL ROOM INTERGRATION
MAY.01-AUG.01
ASIA CEMENT ELECTRICAL WORK FOR K-3,4 WASTE PLASTIC CRUSHER INSTALLATION
MAY.01-JUL.01
SAMSUNG CORPORATION ELECTRICAL WORK AND INSTRUMENTATION FOR KIHUNG NITROGEN PLANT CONSTRUCTION
OCT.00-MAY.01
DONGBU CORPORATION ELECTRICAL WORK FOR MILITARY FACILITY CONSTRUCTION IN 00 AREA
JUL.00-MAR.02
SEOUL METROPOLITAN POLICE AGENCY TRAFFIC MONITORING DEVICE AND CABINET REPAIR
JUL.00-NOV.00
POSCON PLUG IN WORK(11A BHS SORTER POWER ELECTROCITY)
JAN.01-MAR.03
POSCON BHS SORTER SYSTEM ELECTRICAL WORK 1
OCT.99-DEC.99
POSCON ELECTRICAL WORK FOR PRE COMM'(NEW AIRPORT BAGGAGE SYSTEM)
AUG.99-MAR.03
SAMSUNG HEAVY INDUSTRIES INCHEON HOUSEHOLD WASTE INCINERATOR FACILITY CONSTRUCTION
JUN.96-DEC.01
ASIA CEMENT ELECTRICAL WORK FOR RAM MILL-1,2 AUTOMATION
DEC.98-MAR.99
ASIA CEMENT ELECTRICAL WORK FOR K-3 COOLER ALTERATION
NOV.98-APR.99
ASIA CEMENT ELECTRICAL WORK FOR DEOKSO LOADING FACILITY EXTENSION
SEP.97-NOV.97
SANGMYUNG UNIVERSITY CHEONAN CAMPUS MULTI PURPOSE HALL POWER TRANSFORMATION SYSTEM INSTALLATION
APR.97-JUL.97
HANIL ENGINEERING AND CONSTRUCTION #9 C/M MANUFACTURING / INSTALLATION
MAR.97-AUG.97
ASIA PAPER INSTRUMENTATION FOR PM3 AUTOMATION
JAN.97-MAY.97
ASIA PAPER PM3 154KV S/S ADDITIONAL WORK
MAY.96-APR.97
TONG YANG CEMENT KUNSAN SPECIAL D-M ELECTRICAL WORK
MAY.96-NOV.96
TONG YANG CEMENT INSTRUMENTATION FOR COAL PULVERIZATION ROOM 5
MAY.96-JUL.96
TONG YANG CEMENT DAEBUL S/S ELECTRICAL WORK
MAR.96-NOV.96
TONG YANG CEMENT BUSAN JEONGKWAN B/P ELECTRICAL WORK
MAR.96-JUN.96
TONG YANG CEMENT BUSAN FACTORY 1 B/P CAPACITY INCREASE ELECTRICAL WORK
FEB.96-APR.96
ASIA CEMENT ELECTRICAL WORK FOR DRY MORTAR EQUIPMENT
JAN.96-APR.96
HANIL CEMENT SILO ELECTRICAL WORK
SEP.95-MAY.96
HANIL CEMENT K-1,2 AQC ELECTRICAL ROOM RESTORATION
OCT.95-OCT.95
HANIL CEMENT ELECTRICAL WORK FOR 6.6 KV MAIN CABLE DISTRIBUTION
SEP.95-JUN.96
HANIL CEMENT CLINKER TRANSFER EQUIPMENT ELECTRICAL WORK AND INSTRUMENTATION
SEP.95-MAY.96
HANIL CEMENT RM&EP ELECTRICAL WORK AND INSTRUMENTATION
SEP.95-MAY.96
HANIL CEMENT KILN ELECTRICAL WORK AND INSTRUMENTATION
SEP.95-MAY.96
DONG KUNG CONCRETE DRY MORTAR POWER CABLE EXTENSION
SEP.95-SEP.95
TONG YANG CEMENT ELECTRICAL WORK FOR ANYANG FACTORY POWER RECEPTION AND CABLE TRAY REINSTALLATION
AUG.95-AUG.98
ASIA CEMENT LIMESTONE CMB CONSTRUCTION ELECTRICAL WORK
MAY.95-NOV.95
ASIA CEMENT 1, 2 MINE CRUSHER INSTALLATION ELECTRICAL WORK
APR.95-DEC.95
ASIA CEMENT MINE DISTRIBUTION CABLE TRAY INSTALLATION
APR.95-NOV.95
ASIA CEMENT ELECTRICAL WORK FOR YONGIN FACTORY RESEARCH BUILDING
DEC.04-JAN.05
HANIL CEMENT #5 C/M POLYCOM FACILITY(ELECTRICAL)
MAY.95-JUN.95
TONG YANG CEMENT KWANGYANG SLAG PLANT MILL PART ELECTRICAL WORK
MAR.95-JUN.95
HANIL CEMENT KAYA READY MIXED MORTAR FACTORY POWER RECEPTION SYSTEM WORK
JAN.95-MAY.95
HANIL CEMENT POHANG PLANT EXTENSION(ELECTRICAL WORK)
JAN.95-JUL.95
TONG YANG CEMENT K-3 E.P CONSTRUCTION ELECTRICAL WORK
DEC.94-FEB.95
TONG YANG CEMENT ELECTRICAL WORK FOR DONG JIN GONGYOUNG B/P AND WASTE WATER TREATMENT FACILITY
OCT.94-DEC.94
TONG YANG CEMENT 6K RESTORATION MATERIALS SUPPLY AND PREHEATING SECTOR
AUG.94-NOV.94
TONG YANG CEMENT JEONJU FACTORY SILO EXTENTION(ELECTRICAL)
JUL.04-NOV.94
TONG YANG CEMENT DOAN S.S CONSTRUCTION ELECTRICAL WORK
JUN.94-SEP.94
DAEWOO ENGINEERING TONG YANG CONFECTIONERY CHEONGJU FACTORY SNACK BUILDING ELECTRICAL WORK
MAR.94-JUN.94
ORION FRITO-LAY DORITOS/FRITOS LINE ELECTRICAL WORK
APR.94-MAY.94
ASIA CEMENT K-1,2 BLENDING SILO ELECTRICAL WORK
APR.94-AUG.94
TONG YANG CEMENT OSIP STREAM HWENGDAN 4 B/D LINE ELECTRICAL WORK
FEB.94-FEB.94
TONG YANG CEMENT NEW CEMENT MILL PULVERIZATION ROOM SECTION POWER
JAN.94-JUN.94
TONG YANG CEMENT DAEWON SANUP B/P SHIFT ELECTRICAL WORK
JAN.94-DEC.94

Daesun Electric & Communication Co., Ltd # Dong Sin Bldg. 55 22Gil Sa-Pyung Dae Ro Soe Cho-gu, Seoul
TEL:82-2-3406-1400 / FAX. 82-2-2272-3728, 82-2-2264-3728 / E-MAIL:dsplant@daesun.co.kr