| CUSTOMER
| PROJECT NAME | WORK PERIOD |
KOREA HYDRO & NECLEAR POWER / SAMSUNG CORPORATION |
NEW WOLSONG NUCLEAR POWER PLANT #1,2 MAIN FACILITY WORK CABLE TRAY AND TERMINATION WORK |
2009.04-2012.08 |
| SAMSUNG CORPORATION |
SAMSUNG TOTAL STC OCU ELECTRICAL AND INSTRUMENTATION WORK |
2009.03-2009.10 |
| POSCO E&C |
POHANG NEW STEEL MAKING / CONTINUOUS CASTING 3RD~5TH |
2008.12-2010.07 |
| POSCO E&C |
KWANGYANG MATERIAL PROCESSING FACILITY RATIONALIZATION |
2008.10-2009.10 |
KOREA MIDLAND POWER/ KC COTTRELL |
JEJU INTERNAL COMBUSTION #2 DESULFURIZATION & ELECTRICAL DUST COLLECTOR WORK |
2008.10-2008.12 |
DOOSAN HEAVY INDUSTRIES & CONSTRUCTION/ HWACHEON PLANT |
BORYEONG THERMAL POWER PLANT PERFORMANCE IMPROVEMENT WORK (ELECTRICAL AND INSTRUMENTATION WORK) |
2008.10-2009.06 |
KOREA EAST-WEST POWER/ HANJOONG PLANT |
DANGJIN #7,8 SOOT BLOWER WORK (ELECTRICAL AND INSTRUMENTATION WORK) |
2008.09-2009.10 |
KOREA MIDLAND POWER/ DAELIM INDUSTRIAL |
JEJU INTERNAL COMBUSTION #2 ELECTRICAL WORK |
2008.07-2009.06 |
| SAMSUNG ENGINEERING CO., LTC. |
SAMSUNG CORNING PRECISION GLASS KN05~08 FORMING FACTORY INSTRUMENTATION WORK |
JAN.08-DEC.08 |
| KOREA WATER RESOURCES CORPORARION/DAEWOO ENGINEERING & CONSTRUCTION CO. LTD | SIHWA TIDAL POWER PLANT CONSTRUCTION 154KV POWER TRANSMISSION LINE UNDERGROUND WORK(ELECTRICAL #2 SECTION) | DEC.07-SEP.09 |
| SAMSUNG ENGINEERING CO., LTC. | SAMSUNG CORNING PRECISION GLASS EXTENSION ELECTRICAL INSTALLATION WORK | OCT.07-DEC.07 |
| LG PETRO. CO. LTD | ELECTRICAL WORKS FOR BPA CONTROL ROOM REMODELING | OCT.07-JAN.08 |
| GS ENGINEERING & CONSTRUCTION | YEOCHEON LGPC B2 PROJECT ELECTRICAL WORK | JUN.07-JUN.08 |
| KOREA HYDRO & NECLEAR POWER/HYUNDAE ENGINEERING & CONSTRUCTION ETC | SINKORI POWER PLANT #1.2 CABLE TRAY INSTALLATION(AREA 2) | MAR.07-DEC.10 |
| NATIONAL FUSION RESEARCH INSTITUTE/SAMSUNG CORPORATION | ELECTRICAL AND INSTRUMENTAION WORK FOR LOW TEMPERATURE HELIUM EQUIPMENT INSTALLATION | MAR.07-AUG.08 |
| KOREA NATIONAL HOUSING CORPORATION/KEANGNAM ENTERPRISES | ASAN BAEBANG AREA COLLECTIVE ENERGY FACILITY POWER TRANSMISSION AND DISTRIBUTION PIPELINE WORK | MAR.07-AUG.08 |
| POSCO E&C | FINEX #1 CONSTRUCTION(MAIN BODY) 11TH WORK TOWER CRANE REMOVAL | JAN.07-FEB.07 |
| GS ENGINEERING & CONSTRUCTION | DAESAN LG CHEM REVAMPING PROJECT INSTRUMENTATION(NCC, BD, BRU) | OCT.06-APR.07 |
| GS ENGINEERING & CONSTRUCTION | YEOCHEON LG MMA YM-3 INSTRUMENTATION | SEP.06-DEC.07 |
| KOREA ELECTRIC POWER CORPORATION CHUNG YANG POWER OFFICE | 154 KV KWANCHANGDONG TWO STEEL TOWER BASE REINFORCEMENT | AUG.06-JAN.07 |
| POSCO E&C | INCHON INTERNATIONAL AIRPORT 2ND PHASE RUNWAY 3 B/C AREA 2 ELECTRICAL WORK(REMOVAL) | MAY.06-DEC.06 |
| BOOWON CONSTRUCTION | ELECTRICAL AND INSTRUMENTATION WORK FOR BUYEO SEWAGE TREATMENT PLANT ADVANCED TREATMENT FACILITY | MAY.06-DEC.06 |
| KOREA WESTERN POWER/DOOSAN HEAVY INDUSTRIES & CONSTRUCTION | TEMPORARY POWER MAINTENANCE WORK FOR TAEAN THERMAL POWER PLANT #7.8 CONSTRUCTION | JAN.06-FEB.07 |
| KOREA SOUTHERN POWER/DOOSAN HEAVY INDUSTRIES & CONSTRUCTION | ELECTRICAL AND INSTRUMENTATION WORK FOR HADONG THERMAL POWER PLANT #5.6 | JAN.06-JUN.06 |
| KOREA SOUTHERN POWER/SAMSUNG CORPORATION | HADONG THERMAL PLANT #7.8 EPC GROUNDING EQUIPMENT AND TEMPORARY POWER MAINTENANCE WORK | DEC.05-MAY.09 |
| GS ENGINEERING & COSTRUCTION | YEOCHEON LGPC M2 INSTRUMENTATION | DEC.05-DEC.06 |
| KOREA SOUTHERN POWER/DOOSAN HEAVY INDUSTRIES & CONSTRUCTION | ELECTRICAL AND INSTRUMENTATION WORK FOR KOREA HADONG THERMAL POWER PLANT #7.8 TURBINE EPC CONSTRUCTION | NOV.05-JUN.09 |
| POSCO E&C | PO)3 CONTINUOUS CASTING NO4 M/C RATIONALIZATION 2ND~3RD WORK | NOV.05-JUN.06 |
| KOREA EAST-WEST POWER/DOOSAN HEAVY INDUSTRIES & CONSTRUCTION | INSTRUMENTATION FOR DANGJIN THERMAL POWER #7.8 TURBINE GENERATOR INSTALLATION | OCT.05-DEC.07 |
| KOREA EAST-WEST POWER/DOOSAN HEAVY INDUSTRIES & CONSTRUCTION | INSTRUMENTATION FOR DANGJIN THERMAL POWER BOILER INSTALLATION | OCT.05-DEC.07 |
| KOREA WESTERN POWER/DOOSAN HEAVY INDUSTRIES & CONSTRUCTION | ELECTRICAL AND INSTRUMENTATION WORK FOR TAEAN THERMAL POWER PLANT #7,8 DESULFURIZATION EQUIPMENT INSTALLATION | SEP.05-AUG.07 |
| KOREA WESTERN POWER/DOOSAN HEAVY INDUSTRIES & CONSTRUCTION | TAEAN THERMAL POWER PLANT #7.8(TEMPORARY POWER AND GROUNDING WORK) | SEP.05-MAY.07 |
| POSCO E&C | FINEX #1(MAIN BODY) 4,6,7TH WORK (ELECTRIC FURNACE) | APR.05-DEC.06 |
| SAMSUNG CORPORATION | MAIN DISTRIBUTION PIPELINE IN CHUNGJU CHUNGBUK AREA 2 | MAR.05-JAN.06 |
| ENERGY SOLUTIONS | ELECTRICAL AND INSTRUMENTATION FOR ASEA CEMENT JECHEON PLANT WASTE HEAT GENERATOR | DEC.04-MAY.05 |
| GS ENGINEERING & CONSTRUCTION | YEOCHUN LGPC MMA YP-2 INSTRUMENTATION | NOV.04-MAY.05 |
| DOOSAN HEAVY INDUSTRIES & CONSTRUCTION | TAEAN THERMAL POWER PLANT #7.8(LIGHTING AND COMMON USE FACILITIES WORK) | OCT.04-AUG.07 |
| POSCO E&C | KWANGYANG #1 STEEL MAKING HOT METAL PREPARATION EQUIPMENT RATIONALIZATION 1ST WORK | OCT.04-OCT.05 |
| KOREA COTTRELL | YOUNGDONG THERMAL POWER PLANT EP ELECTRICAL REMOVAL | SEP.04-NOV.04 |
| DAELIM INDUSTRIAL | JEJU THERMAL POWER PLANT COMBUSTION EQUIPMENT REPLACEMENT | JUL.04-JUN.05 |
| SAMSUNG CORPORATION | DANGJIN THERMAL POWER PLANT #7.8 TEMPORARY POWER | JUN.04-DEC.07 |
| KOREA COTTRELL | ELECTRICAL, INSTRUMENTATION AND GROUNDING WORK FOR DANGJIN THERMAL POWER PLANT #5.6 | JUN.04-SEP.05 |
| KOREA COTTRELL | INSTRUMENTATION FOR SINTERING DUST COLLECTOR INTERNAL REPLACEMENT | FEB.04-APR.04 |
| KOREA ELECTRIC POWER CORPORATION | ELECTRICAL WORKS FOR JAE JU THERMAL POWER PLANT | JAN.04-MAY.05 |
| POSCO E&C | KWANGYANG #3.4 COKE CDQ EQUIPMENT 1ST~8TH WORK | OCT.03-AUG.05 |
| KOREAN COTTRELL | YOUNGDONG THERMAL POWER PLANT ELECTRICAL DUST COLLECTOR REMOVAL AND INSTALLATION | NOV.03-JAN.04 |
| LG ENGINEERING & CONSTRUCTION | INCHON COMBINED CYCLE THERMAL POWER PLANT TEMPORARY POWER EQUIPMENT WORK | MAY.03-JUN.06 |
| KOREA ELECTRIC POWER CORPORATION | ELECTRICAL WORKS OF INCIDENTAL FACILITIES FOR DANG JIN THERMAL POWER PLANT | APR.03-JUN.06 |
| KOREA EAST-WEST POWER/DOOSAN HEAVY INDUSTRIES & CONSTRUCTION | DANGJIN THERMAL POWER PLANT #5.6 CONSTRUCTION(ELECTRICAL INCIDENTAL EQUIPMENT INSTALLATION) | APR.03-JUN.06 |
| POSCO E&C | KWANGYANG 1 CONTINUOUS CASTING PLANT CONTINUOUS CASTER REVAMPING 2,3,4TH ELECTRICAL WORK | JAN.03-JUL.03 |
| KOREA ELECTRIC POWER CORPORATION/DONGAH CONSTRUCTION | ULJIN #6 COMMUNICATION AND SECURITY SYSTEM(RCB, PAB) INSTALLATION(CP-E5) | AUG.02-MAY.05 |
| LG ENGINEERING & CONSTRUCTION | YEOCHEON LG MMA YM-2 PORJECT ELECTRICAL WORK | APR.02-MAR.03 |
| DOOSAN HEAVY INDUSTRIES & CONSTRUCTION | WOOMYUN MOUNTAIN TUNNEL PRIVATE FINANCED FACILITY 2ND CONSTRUCTION | APR.02-OCT.03 |
| POSCO E&C | ELECTRICAL WORK FOR POHANG 2ND STEEL MAKING NO1 RH-OB RATIONALIZATION | MAR.02-AUG.02 |
| POSCO E&C | KWANGYANG BALST FURNACE 1 REVAMPING 5TH WORK(ELECTRICAL 1) | MAR.02-AUG.02 |
| POSCO E&C | KWANGYANG BLAST FURNACE 1 REVAMPING 4TH WORK(ELECTRICAL 2) | FEB.02-AUG.02 |
| POSCE E&C | KWANG)1.2 BLAST FURNACE TOP SPIRAL CHUTE DRIVE GEAR BOX REPLACEMENT | JAN.02-JUN.02 |
| POSCE E&C | KWANGYANG BLAST FURNACE 1 REVAMPING 3RD WORK(ELECTRICAL 1) | SEP.01-JUL.02 |
| KOREA ELECTRIC POWER CORPORATION/DONGAH CONSTRUCTION | ULJIN #5.6 CP-E1(EQUIPMENT, EX/GROUNDING, LIGHTING, H/TRACING, F/BARRIER) INSTALLATION | JUL.01-MAY.05 |
| POSCE E&C | KWANGYANG BLAST FURNACE 1 REVAMPING 2ND WORK(ELECTRICAL 1) | JUL.01-JAN.02 |
| POSCE E&C | KWANGYANG BLAST FURNACE 1 REVAMPING 1ST WORK(ELECTRICAL 1) | APR.01-JAN.02 |
| KOREA ELECTRIC POWER CORPORATION | CP-E5 WORKS(COMMUNICATION & SECURITY FACILITY) FOR UL-JIN NEW CLANT POWER PLANT UNIT 526 | APR.01-MAY.05 |
| POSCO | REVAMPING OF ELECTRICAL PARTS FOR UNIT 1 MELTING FURNACE OF KWANG-YANG IRON MILLS | APR.01-AUG.02 |
| KOREA ELECTRIC POWER CORPORATION/DOOSAN HEAVY INDUSTRIES & CONSTRUCTION | YOUNG HEUNG THERMAL POWER PLANT #1,2 ELECTRICAL WORK(GROUNDING EQUIPMENT INSTALLATION) | AUG.02-MAY.05 |
| KOREA ELECTRIC POWER CORPORATION/DOOSAN HEAVY INDUSTRIES & CONSTRUCTION | CABLE TRAY WORK FOR YOUNG-HEUNG THERMAL POWER PLANT UNIT 1 & 2. | DEC.00-JUN.04 |
| KOREA ELECTRIC POWER CORPORATION | CABLE TRAY OF ELECTRICAL & INSTRUMENTATION WORKS FOR ULJIN NUCLEAR POWER PLANT 5,6 | JUL.00-JUN.03 |
| KOREA ELECTRIC POWER CORPORATION/SAMSUNG CORPORATION | CABLE TRAY WORK FOR ULJIN #5,6 MAIN FAILITY | JUL.00-JUN.03 |
| LG ENGINEERING & CONSTRUCTION | YEOCHEON LG DOW POLYCABONATE PLANT | JUN.00-MAY.01 |
| KOREA ELECTRIC POWER CORPORATION/SHINHWA CONSTRUCTION | HADONG THERMAL POWER PLANT ONGOING MAINTENANCE AND LIGHTING WORK | MAR.00-DEC.02 |
| KOREA ELECTRIC POWER CORPORATION/LG ENGINEERING & CONSTRUCTION | CABLE PULLING & FREEZING PREVENT CONSTRUCTION FOR TAE-AN THERMAL POWER PLANT | FEB.00-MAY.02 |
| KOREA ELECTRIC POWER CORPORATION/DOOSAN HEAVY INDUSTRIES & CONSTRUCTION | ELECTRICAL AND INSTRUMENTATION WORK FOR TAEAN THERMAL POWER PLANT #5,6 DESULFURIZATION EQUIPMENT INSTALLATION | JAN.00-SEP.02 |
| POSCO/SAMSUNG | ELECTRICAL WORK FOR KWANGYANG LNG PIPELINE NETWORK 4TH CONSTRUCTION | JUL.99-DEC.99 |
| POSCO/SAMSUNG | SECURITY AND ELECTRICAL WORK FOR KWANGYANG CDQ EQUIPMENT CONSTRUCTION 3RD | MAR.99-MAY.99 |
| POSCO/SAMSUNG | ELECTRICAL AND INSTRUMENTATION WORK FOR KWANGYANG CDQ EQUIPMENT CONSTRUCTION | AUG.98-FEB.99 |
| POSCO/SAMSUNG | ELECTRICAL WORK FOR CRUDE STEEL PRODUCTION INCREASE VENTILATION SYSTEM 1ST | JUN.98-JAN.99 |
| KOREA ELECTRIC POWER CORPORATION/DOOSAN HEAVY INDUSTRIES & CONSTRUCTION | ELECTRICAL WORK FOR HADONG THERMAL POWER PLANT #5,6 | MAY.98-AUG.01 |
| POSCO/SAMSUNG | ELECTRICAL WORK FOR CRUDE STEEL PRODUCTION INCREASE VENTILATION 2ND WORK | MAY.98-APR.99 |
| POSCO/SAMSUNG | KWANGYANG CDQ PLANT CONSTRUCTION ELECTRICAL AND SLAG WORK | MAY.98-FEB.99 |
| POSCO/SAMSUNG | ELECTRICAL WORK FOR KWANGYANG CRUDE STEEL PRODUCTION INCREASE OXYGEN PLANT 4TH CONSTRUCTION | APR.98-MAY.99 |
| POSCO/SAMSUNG | ELECTRICAL WORK FOR HOT METAL PRETREATMENT 2ND(AREA B) | MAR.98-MAY.99 |
| POSCO/SAMSUNG | LIGHTING AND QUENCHING WORK FOR KWANGYANG CDQ CONSTRUCTION | FEB.98-SEP.98 |
| POSCO/SAMSUNG | ELECTRICAL WORK FOR KWANGYANG RAW MATERIALS #5 3RD | NOV.97-MAR.99 |
| POSCO | ELECTRICAL WORKS, INSTALLATION OF LIGHTING FACILITY, FIRE DETECTION & INSTRUMENTATION WORKS OF KWANGYANG IRON MILL. | NOV.96-MAY.99 |
| KOREA ELECTRIC POWER CORPORATION/DOOSAN HEAVY INDUSTRIES & CONSTRUCTION | HADONG THERMAL POWER PLANT #3,4 ELECTRICAL SUNDRY EQUIPMENT(1-6 DESULFURIZATION) | NOV.96-DEC.97 |
| POSCO | ELECTRICAL WORK FOR KWANGYANG 4TH COLD ROLLING MILL CONSTRUCTION 16TH | NOV.96-AUG.97 |
| POSCO | ELECTRICAL WORK FOR KWANGYANG 4TH COLD ROLLING MILL CONSTRUCTION 6TH | NOV.96-FEB.97 |
| KOREA ELECTRIC POWER CORPORATION/DOOSAN HEAVY INDUSTRIES & CONSTRUCTION | HADONG THERMAL POWER PLANT #1,2 ELECTRICAL SUNDRY EQUIPMENT(ROAD) | OCT.96-DEC.97 |
| KOREA ELECTRIC POWER CORPORATION | INSTALLATION OF LIGHTING EQUIPMENT, FIRE DETECTION SYSTEM FOR HA-DONG THERMAL POWER PLANT U-3,4 | MAY.96-SEP.99 |
| KOREA ELECTRIC POWER CORPORATION/DOOSAN HEAVY INDUSTRIES & CONSTRUCTION | HADONG THERMAL POWER PLANT #1,2 TURBINE BUILDING TEMPORARY LIGHTING WORK | APR.96-APR.96 |
| POSCO | CAPACITY BUILDING(STEEL MAKING CONTINUOUS CASTING 11TH) | FEB.96-AUG.96 |
| KOREA ELECTRIC POWER CORPORATION/DOOSAN HEAVY INDUSTRIES & CONSTRUCTION | HADONG THERMAL POWER PLANT INDUSTRIAL WATER AUTAMATION AND REMOTE CONTROL SYSTEM | NOV.96-JAN.97 |
| POSCO | ELECTRICAL & INSTRUMENTATION WORKS FOR UNIT 6 KWANGYANG STAINLESS FACTORY | AUG.95-AUG.98 |
| KOREA ELECTRIC POWER CORPORATION/DOOSAN HEAVY INDUSTRIES & CONSTRUCTION | HADONG THERMAL POWER PLANT #1,2 FIRE DETECTION AND ALARM SYSTEM | AUG.95-NOV.97 |
| POSCO | ELECTRICAL WORK FOR CONTINUOUS CASTING 6TH | AUG.95-MAY.96 |
| KOREA ELECTRIC POWER CORPORATION/DOOSAN HEAVY INDUSTRIES & CONSTRUCTION | TAEAN THERMAL POWER PLANT #3,4 GROUNDING EQUIPMENT INSTALLATION | JUN.95-FEB.98 |
| KOREA ELECTRIC POWER CORPORATION/DOOSAN HEAVY INDUSTRIES & CONSTRUCTION | HADONG THERMAL POWER PLANT #1,2 FIRE DETECTION ETC | MAR.95-DEC.97 |
| KOREA ELECTRI POWER CORPORATION | INSTALLATION OF LIGHTING FACILITY FOR HA-DONG THERMAL POWER PLANT UNIT 1 AND 2 | FEB.95-DEC.97 |
| KOREA ELECTRIC POWER CORPORATION/DOOSAN HEAVY INDUSTRIES & CONSTRUCTION | HADONG THERMAL POWER PLANT #1,2 LIGHTING EQUIPMENT INSTALLATION | FEB.95-NOV.97 |
| KOREA ELECTRIC POWER CORPORATION/DOOSAN HEAVY INDUSTRIES & CONSTRUCTION | INSTALLATION OF EQUIPMENT, LIGHTING, FIRE DETECTION AND FREEZE PREVENTION FACILITY FOR UL-JIN NUCLEAR POWER PLANT UNIT 3 & 4 | DEC.94-NOV.98 |
| KOREA ELECTRIC POWER CORPORATION/DOOSAN HEAVY INDUSTRIES & CONSTRUCTION | ELECTRICAL WORK FOR TAEAN THERMAL POWER PLANT INCIDENTAL BUILDING | DEC.94-FEB.96 |
| KOREA ELECTRIC POWER CORPORATION/DOOSAN HEAVY INDUSTRIES & CONSTRUCTION | HADONG THERMAL POWER PLANT #1,2 TEMPORARY BUILDING WORK(ELECTRICAL WORK 2ND) | SEP.94-DEC.94 |
| KOREA ELECTRIC POWER CORPORATION/DOOSAN HEAVY INDUSTRIES & CONSTRUCTION | HADONG THERMAL POWER PLANT TEMPORARY BUILDING WORK(ELECTRICAL WORK 1ST) | JUN.94-JUL.94 |
| KOREA ELECTRIC POWER CORPORATION/DOOSAN HEAVY INDUSTRIES & CONSTRUCTION | TAEAN THERMAL POWER PLANT ELECTRICAL SUNDRY EQUIPMENT 1ST INSTALLATION | APR.94-DEC.95 |
| KOREA ELECTRIC POWER CORPORATION/DOOSAN HEAVY INDUSTRIES & CONSTRUCTION | TAEAN THERMAL POWER PLANT #1,2 GROUNDING WORK | NOV.93-SEP.95 |
| KOREA ELECTRIC POWER CORPORATION/DOOSAN HEAVY INDUSTRIES & CONSTRUCTION | TAEAN THERMAL POWER PLANT LIGHTING EQUIPMENT INSTALLATION | SEP.93-MAR.96 |
| KOREA ELECTRIC POWER CORPORATION | INSTALLATION OF LIGHTING FACILITY FOR TAE-AN THERMAL POWER PLANT UNIT 1 AND 2 | AUG.93-MAR.96 |
| KOREA ELECTRIC POWER CORPORATION/DOOSAN HEAVY INDUSTRIES & CONSTRUCTION | BO-RYONG THERMAL POWER PLANT #5,6 ELECTRICAL SUNDRY EQUIPMENT(DUST COLLECTOR) INSTALLATION | NOV.92-MAR.94 |
| KOREA ELECTRIC POWER CORPORATION/DOOSAN HEAVY INDUSTRIES & CONSTRUCTION | BO-RYONG THERMAL POWER PLANT #3,4 CLOCK EQUIPMENT INSTALLATION | APR.92-MAR.93 |
| KOREA ELECTRIC POWER CORPORATION | ELECTRICAL WORKS FOR ELECTRIC DUST COLLECTOR FOR BO-RYONG THERMAL POWER PLANT UNIT 3 AND 4. | FEB.92-JAN.93 |
| KOREA ELECTRIC POWER CORPORATION/DOOSAN HEAVY INDUSTRIES & CONSTRUCTION | BO-RYONG THERMAL POWER PLANT LIGHTING EQUIPMENT INSTALLATION | OCT.91-JAN.94 |
| KOREA ELECTRIC POWER CORPORATION/DOOSAN HEAVY INDUSTRIES & CONSTRUCTION | BO-RYONG THERMAL POWER PLANT WATER TREATMENT INSTALLATION | JUN.91-SEP.92 |
| KOREA ELECTRIC POWER CORPORATION/DOOSAN HEAVY INDUSTRIES & CONSTRUCTION | INSTALLATION OF LIGHTING FACILITY FOR BO-RYONG THERMAL POWER PLANT UNIT 3 AND UNIT 4. | MAY.91-FEB.93 |
| KOREA ELECTRIC POWER CORPORATION/DOOSAN HEAVY INDUSTRIES & CONSTRUCTION | O.H CRANE 2 AND GRANTRY CRANE | MAR.91-JUL.92 |
| KOREA ELECTRIC POWER CORPORATION/DOOSAN HEAVY INDUSTRIES & CONSTRUCTION | FABRICATION OF CONTROL PANEL FOR FACILITY OF CONDENSED WATER DESALINATION FOR KO-RI NUCLEAR POWER PLANT NO.1 AND ELECTRICAL/ INSTRUMENT WORKS. | NOV.81-MAR.83 |